| Aircraft Serial |
Type |
Aircraft History |
| E6145 |
7F.1 |
One of 400 Snipes built to contract 35A/436/C303 by Boulton Paul, Norwich. Served with 8 Sqn, AFC |
| E6146 |
7F.1 |
One of 400 Snipes built to contract 35A/436/C303 by Boulton Paul, Norwich. Served with 8 Sqn, AFC |
| E6150 |
7F.1 |
One of 400 Snipes built to contract 35A/436/C303 by Boulton Paul, Norwich. Served with 5 Sqn, AFC.

|
| E6151 |
7F.1 |
One of 400 Snipes built to contract 35A/436/C303 by Boulton Paul, Norwich. Served with 5 Sqn, AFC. |
| E6184 |
7F.1 |
One of 400 Snipes built to contract 35A/436/C303 by Boulton Paul, Norwich. Served with 4 Sqn, AFC. |
| E7345 |
7F.1 |
One of 500 Snipes built to contract 35A/433/C301 by Ruston Proctor, Lincoln. Served with 4 Sqn, AFC. Transferred to 70 Sqn, RAF after 4 Sqn AFC disbanded on 28/01/1919. |
| E7355 |
7F.1 |
One of 500 Snipes built to contract 35A/433/C301 by Ruston Proctor, Lincoln. Served with 4 Sqn AFC. |
| E7358 |
7F.1 |
One of 500 Snipes built to contract 35A/433/C301 by Ruston Proctor, Lincoln. Served with 4 Sqn AFC. |
| E7359 |
7F.1 |
One of 500 Snipes built to contract 35A/433/C301 by Ruston Proctor, Lincoln. Served with 5 Sqn, AFC. |
| E7375 |
7F.1 |
One of 500 Snipes built to contract 35A/433/C301 by Ruston Proctor, Lincoln. Served with 5 Sqn, AFC. |
| E7376 |
7F.1 |
One of 500 Snipes built to contract 35A/433/C301 by Ruston Proctor, Lincoln. Served with 5 Sqn, AFC.

|
| E7377 |
7F.1 |
One of 500 Snipes built to contract 35A/433/C301 by Ruston Proctor, Lincoln. Served with 8 Sqn, AFC.

|
| E7379 |
7F.1 |
One of 500 Snipes built to contract 35A/433/C301 by Ruston Proctor, Lincoln. Served with 5 Sqn, AFC. |
| E7379 |
7F.1 |
One of 500 Snipes built to contract 35A/433/C301 by Ruston Proctor, Lincoln. Served with 5 Sqn, AFC. |
| E7395 |
7F.1 |
One of 500 Snipes built to contract 35A/433/C301 by Ruston Proctor, Lincoln. Served with 4 Sqn, AFC.

|
| E8011 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8017 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC |
| E8021 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8022 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 05/10/1918(One of the second batch six Snipes received by the unit). |
| E8025 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8038 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 04/10/1918(One of the first batch six Snipes received by the unit). Took part in 4 Sqn’s first offensive patrol with Snipes 29/10/1919. |
| E8043 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8050 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 04/10/1918(One of the first batch six Snipes received by the unit). |
| E8052 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 05/10/1918 (One of the second batch six Snipes received by the unit). |
| E8056 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 05/10/1918(One of the second batch six Snipes received by the unit). Coded Z. As part of the British Army of Occupation, No 4 Squadron was stationed at Bickendorf in Cologne from 7 December 1918 until March 1919.

|
| E8057 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8058 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. Coded/marked 8. As part of the British Army of Occupation, No 4 Squadron was stationed at Bickendorf in Cologne from 7 December 1918 until March 1919. |
| E8062 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 04/10/1918(One of the first batch six Snipes received by the unit). Took part in 4 Sqn’s first offensive patrol with Snipes 29/10/1919. |
| E8063 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 04/10/1918 (One of the first batch six Snipes received by the unit). Took part in 4 Sqn’s first offensive patrol with Snipes 29/10/1919. |
| E8064 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8065 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 04/10/1918 (One of the first batch six Snipes received by the unit). Took part in 4 Sqn’s first offensive patrol with Snipes 29/10/1919. |
| E8069 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 05/10/1918 (One of the second batch six Snipes received by the unit). Coded 2. As part of the British Army of Occupation, No 4 Squadron was stationed at Bickendorf in Cologne from 7 December 1918 until March 1919.

|
| E8070 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 05/10/1918 (One of the third batch six Snipes received by the unit to make up the initial strength of 18 Snipes). |
| E8071 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. First Sopwith Snipe to be fitted with wings modified with a 3 ply nosing. This had been common practice with SE-5a’s, and the RFC requested that Snipes be similarly reinforced. This later became production standard. |
| E8072 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8073 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 05/10/1918 (One of the second batch six Snipes received by the unit). |
| E8074 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8075 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 05/10/1918 (One of the third batch six Snipes received by the unit to make up the initial strength of 18 Snipes). |
| E8082 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 05/10/1918 (One of the third batch six Snipes received by the unit to make up the initial strength of 18 Snipes). Coded . As part of the British Army of Occupation, No 4 Squadron was stationed at Bickendorf in Cologne from 7 December 1918 until March 1919.

|
| E8088 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 04/10/1918 (One of the first batch six Snipes received by the unit). |
| E8092 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8094 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8096 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 05/10/1918 (One of the third batch six Snipes received by the unit to make up the initial strength of 18 Snipes). |
| E8099 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 05/10/1918 (One of the third batch six Snipes received by the unit to make up the initial strength of 18 Snipes). |
| E8100 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Received by 4 Sqn, AFC from 1 ASD 05/10/1918 (One of the second batch six Snipes received by the unit). Took part in 4 Sqn’s first offensive patrol with Snipes 29/10/1919. |
| E8103 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. Coded S

|
| E8107 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8117 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8121 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8124 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 5 Sqn, AFC. |
| E8138 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 5 Sqn, AFC.

|
| E8142 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 5 Sqn, AFC |
| E8146 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8148 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8157 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8163 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. Transferred to 70 Sqn, RAF after 4 Sqn AFC disbanded on 28/01/1919. |
| E8164 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8187 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8199 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8205 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8230 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8261 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8263 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. Transferred to 70 Sqn, RAF after 4 Sqn AFC disbanded on 28/01/1919. |
| E8265 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8277 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8284 |
7F.1 |
One of 300 Snipes built to contract 35A/432/C200 by Sopwith. Served with 4 Sqn, AFC. |
| E8331 |
7F.1 |
One of 100 Snipes built to contract 35A/431/C299 by Portholme Aerodrome of Huntingdon. Served with 5 Sqn, AFC. |
| F2351 |
7F.1 |
One of a batch 200 Snipes built by Sopwith. Served with 4 Sqn, AFC. Transferred to 70 Sqn, RAF after 4 Sqn AFC disbanded on 28/01/1919. |
| F2352 |
7F.1 |
One of a batch 200 Snipes built by Sopwith. Served with 5 Sqn, AFC. |
| F2367 |
7F.1 |
One of a batch 200 Snipes built by Sopwith. Served with 4 Sqn, AFC. |